Installation Video

[YouTube_WD id=23 item=23]

1. Introduction 0:01
2. Standard Components & Assemblies Supplied 0:14
3. Tools Required 0:37
4. Preparing for Installation 1:04
5. Installing Head Box & Side Guide Channels 2:51
6. Important Measurement Checks 6:14
7. Changing the Motor Position 6:53
8. Installing the Barrel Assembly 7:39
9. Connecting Motor Test Lead 9:13
10. Cable Installation 9:35
11. Spring Tensioning Using the Handset 11:09
12. Cable Grip Lock Demonstration 13:30
13. Cutting of Tension Cable to Specified Length 13:56
14. Tensioning the Fabric 14:46
15. Fit the Side Lock Guides 15:33
16. Setting Retracted Hembar Position 16:24
17. Setting Deployed Hembar Position 17:45
18. Test Commission 19:19
19. Fit the Front Guide Covers 19:53
20. Fit Head Box Front Cover 21:00
21. Final Check 21:46